Reading Curb

Posted on Jun 01

We replaced the curbs according to Shillington Borough’s specifications. This curb, along with numerous others in Shillington, had been replaced due to the five street renovations that will be occurring in the summer of 2011.

HHGREG Appliance Store

Posted on May 22

This project was the transformation from the old Circuit City into the new HHGREG Appliance store located on the Berkshire Mall Complex. We completed all the exterior concrete piers, curbs,  and sidewalks as directed by the Berkshire Mall and their drawings. This project was completed in April of 2010.

Reading Housing Authority

Posted on May 22

This project involved renovating the existing administration building to make it handicap accessible. We added a ramp with railing system, new curbs to create a van drop off zone and sidewalks with ADA truncated domes making this area ADA compliant. Read More

Siedel Resident Sidewalk

Posted on May 22

We took this sidewalk from zero to hero out in Wyomissing, PA. We removed an existing brick walkway that was lined with 6 X 6 pressure treated wood and replaced it with this free formed concrete sidewalk. This project was completed May 21, 2010.

Burkey Garage Floor

Posted on May 07

This project was completed in May 2010 for the Burkey family in Collegeville, PA who asked us to replace their garage floor. Read More

Stamped Porch and Walk

Posted on Feb 26

This project was completed in November 2009. After two unsuccessful experiences with another contractor that attempted to replace the porch and walk, the homeowner decided to call us in to make the repairs so they didn’t have to replace everything a third time. Read More

Eshelman’s Transportation, Inc.

Posted on Feb 23

This is a project we completed in February 2010 for Eshelman’s Transportation Inc. who asked us to install an epoxy coating system. Read More

Goldberg Rental Property

Posted on Dec 22

Cold weather and snow doesn’t stop us from getting the job done. We completed this project December 2009.

Kern’s Residence

Posted on Sep 15

This project was completed in September of 2009. We worked on the pouring and finish of the new sidewalk at the Kern’s Residence.

Span Sign Footings

Posted on Aug 30

This project was completed in August 2009. We completed the excavation, forming, pouring, striping, rubbing, and clean up for the new footings to hold up the new span sign across the road where you enter Harrisburg Community College.