Peterson Pool Patio
Posted on Jun 26This project was completed on June 15, 2011 in Douglassville, PA. We helped the Peterson’s by pouring a concrete patio extension to their existing patio area.
Guy’s Garage Floor
Posted on Jun 26This project was completed on June 9, 2011 in Douglassville, PA. We helped the Guy family by pouring a regular concrete floor for their garage.
Snover Laundromat Foundation
Posted on Jun 26This project was completed in the Fall of 2010 in Reading, PA. We helped the laundromat by completing all its floors including pouring the basement and two crawl spaces under the dryer areas.
Cooke Residence
Posted on Dec 23The Cooke’s wanted to add an addition to the back of their house. We helped them with several aspects of the project from laying out the addition to grading off the area when we were finished. Read More
Coldren Block Retaining Wall
Posted on Nov 01We started by installing the new block retaining wall flower bed / sitting walls. This product was Imperial Block in the color earth. Once completed, we installed a new Arizona Flagstone Stamped Concrete Patio. Read More
Moyer Retaining Wall
Posted on Oct 02We started by installing the new 21” sitting walls. This product was E. P. Henry Block in the color Harvest. Once completed we installed a new Yorkstone Stamped Concrete Patio. Read More
Schnour Patio and Sidewalk
Posted on Oct 01The Schnour’s installed a new addition onto their house and needed our assistance. We helped by installing a new sandstone colored patio and sidewalk on both sides of this new addition.
Albright College Walkway
Posted on Sep 01In September 2010, we helped Albright College pour a new ramp into one of their buildings and add a new landing at the top of the steps. This work was completed because they installed new steel columns, beams, and decking because they had rooted out and were unsafe.
Weintzel Stamped Sidewalk
Posted on Jun 09Cleaver Patio
Posted on Jun 08This project involved taking an existing patio and overlaying it with an “Arizona Flagstone” pattern on top and staining it with different colors to make it a one of a kind. It was completed in a little over a week as we worked around the weather conditions.